..

Journal de génie civil et environnemental

Soumettre le manuscrit arrow_forward arrow_forward ..

Detail Study of Delay Analysis in Construction Projects due to Multiple Factors Using RII Method

Abstract

Surbhi Singh

In the construction industry, the occurrence of delay is a common issue which then, is responsible for the extension of the project time from its original deadline. This study investigates the causes of delay in construction industry due to multiple reasons which involves different factors along with its effect on the duration of the project, by conducting a survey and then questionnaire was prepared by consulting construction site personnel, which lists a number of causes. Study concludes that the most important five factors which were responsible for the delay and have the following RII values respectively- 0.60, 0.59, 0.52, 0.48 and the 5th rank has two factors whose RII value were same that is 0.43.

Avertissement: Ce résumé a été traduit à l'aide d'outils d'intelligence artificielle et n'a pas encore été examiné ni vérifié

Partagez cet article

Indexé dans

arrow_upward arrow_upward