Moges Tariku
The constructed drainage structure was expected to carry the design discharge which generated from the catchment area and dispose safely to the outlet points. The study has mainly focused to assessing current status of drainage system and evaluates the hydraulic performance of the drainage system. The rational methods have been used to calculate proposed discharge and HY-8 software used for culvert analysis. The current drainage status of the towns was poor, the road performance was reduced to deliver, the service life of the road reduced, and the cost for maintaining the road increased, the compression between the proposed and existed carrying capacity of drainage structures showed that the exist drainage structures are hydraulically insufficient. HY 8 result shows the existed culvert was hydraulically insufficient and 50-63.5% of the proposed peak discharge overtopped and flows on the road.
Partagez cet article